Home

G.V.W. Inc.

Education

North Beverly Elementary School

Tags: , , , , , , , , , , , , , , , , , , , , , ,

Project: New School Construction 
Location: Beverly, MA 
Owner: City of Beverly, Peter Seamans 

Construct site utilities, parking areas, play grounds, and excavate for foundations; construct elementary school from foundation thru interior finishes; demolish existing school building for addition and renovations--General highway, grading, drainage, waterways, sewer construction, water supply construction, recreational facilities, hazardous waste removal, landscaping, site development, underground fuel storage and removal, masonry, painting, sidewalks

Read the full post

Roosevelt Elementary School

Tags: , , , , , , , , , , , , , , , , , , , , , ,

Project: New School Construction 
Location: Melrose, MA 
Owner: City of Melrose, Denise Gaffey 

Construct site utilities excavate for foundation parking areas and play grounds; construct elementary school with cove foundation, structural steel, brick veneer, roofing, windows, doors, and interior finishes; demolish existing school and perform asbestos abatement and contaminated soils removal--General highway, grading, drainage, waterways, sewer construction, water supply construction, recreational facilities, hazardous waste removal, landscaping, site development, underground fuel storage and removal, masonry, painting, sidewalks

Read the full post

Timilty School

Tags: ,

Project: School Renovation 
Location: Roxbury, MA 
Owner: City of Boston, Tom Lahey 

Construct of elevator and water proofing of existing school building

Read the full post

Mary Lyons School

Tags: , , , , , ,

Project: School Renovation 
Location: Brighton, MA 
Owner: Boston Public Schools, Bob Harrington 

Interior build out and renovation of an existing school including doors, windows, roofing, masonry, and interior finishes; complete interior demo of school to allow upgrade of mep and interior finishes including asbestos abatement

Read the full post

Williams Elementary School

Tags: , , , , , , , ,

Project: Elementary School Addition 
Location: Newton, MA 
Owner: City of Newton, Nick Parnell 

Foundation excavation, utility modifications, parking and play ground modifications; construction of an addition to existing school involving concrete foundation, masonry veneer, windows, doors, roofing, structural steel and interior finishes

Read the full post

Bowen Elementary School

Tags: , , , , , , , , ,

Project: Elementary School Addition 
Location: Newton, MA 
Owner: City of Newton, Nick Parnell 

Relocate utilities, excavate foundation, and reconstruct play ground and paved areas; construct school bldg addition including concrete foundation, doors, windows, roofing, masonry, & interior finishes; perform hazardous materials abatement and partial demo of schools to allow construction of addition

Read the full post

Burncoat Middle School

Tags: ,

Project: Window Replacement 
Location: Worcester, MA 
Owner: City of Worcester, Chris Gagliastro 

Remove and replace all windows and perform asbestos abatement

Read the full post

Boston Arts Academy

Tags: , , , ,

Project: Parking Garage
Location: Boston, MA 
Owner: Boston Public Schools, Andy Puleo 

Construct shell of former parking garage including windows, doors, roof partitions, flooring and mep; demolish, gut demolition of parking garage & Boston state college building

Read the full post

South Boston High School

Tags: , , , , ,

Project: New High School Library
Location: South Boston, MA 
Owner: City of Boston, PFD, Mike Hurley 

Construct new library & construct  to existing high school work include concrete foundations, structural steel, windows, doors, interior finishes.  demolish former sheet metal shop & support existing 3 story school wing to construct new library

Read the full post

UMASS Amherst - Webster Hall

Tags: , ,

Project: Webster Hall Renovations 
Location: Amherst, MA 
Owner: University of Masachusetts at Amherst 

Exterior renovation of building envelope including masonry, waterproofing, new windows in a 400 unit dormitory in three months. See the UMASS Amherst Webster Hall Project Photos

Read the full post

1 2 3 4 5

© 2018 G.V.W. Incorporated | All Rights Reserved. | View Full Site